Azure

The following describes the Azure road repairs that have been executed with the Placid Bay Sanitary District Road User Fee.

Tree Removal = $5,000

15 truck loads (335.61 tons) compactible base material delivered on 12/20/2013

18 truck loads (509.78 tons) of C26 Crusher Run delivered between 11/22/2013 and 1/8/2014

Materials = $9,980.03

Total Spent = $14,980.03

$ spent /mile = $40,343.79

$255.51/lot;  $638.78/house