8 truck loads (145 tons) of C26 Crusher Run delivered between 9/18/2013 and 10/4/2013
Total Spent = $2,385.25
$ spent /mile = $10370.65
Future metrics – $/lot; $/house
8 truck loads (145 tons) of C26 Crusher Run delivered between 9/18/2013 and 10/4/2013
Total Spent = $2,385.25
$ spent /mile = $10370.65
Future metrics – $/lot; $/house